Proposed Improvements

This project includes roadway milling and resurfacing, traffic signal improvements, permeable paver installation, curb and gutter removal and replacement, sidewalk removal and replacement, combined sewer repair and lining, pavement marking, tree plantings, and final restoration. This work will typically include:

  • Mill and overlay of Hot Mix Asphalt pavement.
  • The green infrastructure additions of continuous tree pit soil systems, with new trees and tree grates, along with parking stalls with permeable paver installation.
  • Accessible parking stalls with Portland Cement Concrete pavement.
  • Intermittent sidewalk removal and replacement.
  • Americans with Disabilities Act (ADA) compliant sidewalk ramps at intersections.
  • New storm sewer along 16th Street, that will tie into the combination sewer.
  • Temporary traffic signals, along with proposed traffic signal modernization at 16th Street and Wenonah Ave, 16th Street and East Avenue, and 16th Street and Ridgeland Ave.
  • New Traffic signal at 16th Street and Gunderson Ave.
  • Fire hydrant adjustments.
  • Water valve box adjustments.
  • Spot repairs to the combination sewer along 16th Street.
  • Landscape restoration.
  • Trash receptacles and benches
  • New pavement markings, along with bike symbol pavement markings.