16th Street Project

This resurfacing project, with traffic signal improvements, and associated improvements at 16th Street from Harlem Avenue (IL 43) to Lombard Avenue is a continued initiative to improve the infrastructure throughout the community.

The project’s first phase was funded with Congestion Mitigation Air Quality (CMAQ) funds. The project’s design and construction phases are being funded by Surface Transportation Program Urban (STP-Urban), provided by Illinois Department of Transportation (IDOT), and local funds provided by the City of Berwyn.

This street corridor improvements will incorporate green infrastructure as recommended in the City’s Management Plan (July 2018).

Project Information

Project Location and Limits

The project is located on 16th Street from just east of Harlem Avenue (IL 43) to Lombard Avenue. The project will have an omission at Oak Park Avenue for approximately 76.7 feet.  The total gross length is 6,796.5 feet and the net length of the project is 6,719.8 feet and is in the City of Berwyn.  16th Street is a two-way roadway classified as a Major Collector with a speed of 25 mph and an ADT of approximately 9,500 vehicles per day.

Proposed Improvements

This project includes roadway milling and resurfacing, traffic signal improvements, permeable paver installation, curb and gutter removal and replacement, sidewalk removal and replacement, combined sewer repair and lining, pavement marking, tree plantings, and final restoration. This work will typically include:

  • Mill and overlay of Hot Mix Asphalt pavement.
  • The green infrastructure additions of continuous tree pit soil systems, with new trees and tree grates, along with parking stalls with permeable paver installation.
  • Accessible parking stalls with Portland Cement Concrete pavement.
  • Intermittent sidewalk removal and replacement
  • ADA compliant sidewalk ramps at intersections.
  • New storm sewer along 16th Street, that will tie into the combination sewer.
  • Temporary traffic signals, along with proposed traffic signal modernization at 16th Street and Wenonah Ave, 16th Street and East Avenue, and 16th Street and Ridgeland Ave.
  • New Traffic signal at 16th Street and Gunderson Ave.
  • Fire hydrant adjustments.
  • Valve box adjustments.
  • Spot repairs to combination sewer along 16th Street.
  • Landscape restoration.
  • Trash receptacles and benches
  • Install new pavement markings, along with bike symbol pavement markings.

What To Expect

The construction operations, along 16th Street will likely create delays in travel, and motorists should allow extra time through the area. One-way traffic is anticipated during the project. Access to all homes and businesses will be maintained, however, there will inevitably be delays encountered throughout the project. As with any construction project, there will occasionally be inconveniences you may experience when traveling through the area, but the City and Contractor are working together to minimize the disruptions and nuisances. Parking along 16th Street is expected to be unavailable during active construction.

Schedule

This project is anticipated to begin September of 2026 and be substantially complete by September of 2027.

Weather and unforeseen circumstances may adversely affect the proposed schedule.

In accordance with the City of Berwyn ordinance, daily working hours for the construction project are from 7:00 AM to 6:00 PM on weekdays, and 9:00 AM to 6:00 PM on weekends. There is currently no work anticipated on Sundays or major legal Holidays.

Project Notification Letter

Contact Us

Jon Zuhr

Resident Engineer

(847) 821-6212

jzuhr@gha-engineers.com

Jennifer Beckman, P.E.

Project Manager

(312) 806-8727

jbeckman@gha-engineers.com

If you should require special assistance or have construction related questions or concerns, please contact the project’s Resident Engineer, Jon Zuhr.

For other City of Berwyn questions or concerns, please visit the City’s website by clicking on the logo below, or by phone at (708) 484-2510.